Combined Synopsis/Solicitation

DFAC Beverage Cabinet

DEPT OF DEFENSE › DEPT OF THE ARMY › W7M5 USPFO ACTIVITY IDANG 124

Responses are due 2026-09-02, 14:00 (UTC−04:00).

View on SAM.gov →Official listing

Posted
2026-08-28
Response deadline
2026-09-02, 14:00 (UTC−04:00)
Set-aside
Small Business Set Aside - Total (SBA)
NAICS code
333241
Product/service code
3605
Place of performance
Boise, ID, 83705, USA

Description

QUESTIONS and ANSWERS (28 Aug 2026) // Closing date has been adjusted accordingly Questions about the Solicitation: Q: Could you provide exact doorway frame widths, hallway clearances, and ingress path dimensions leading into the Bldg. 400 DFAC to ensure smooth transport of the 158" L units? A: Kitchen door (back dock)-44.5 width and 79 Height // Kitchen hallway 79 width // Kitchen door leading into the DFAC- 68 width Q: Is a brief site visit / walkthrough permitted for local installation scoping? A: No site visit planned AMENDMENT (7 Aug 2026) 1. PURPOSE This amendment serves as official notification that the Request for Quotation (RFQ) for the fabrication and delivery of two custom commercial-grade mobile beverage cabinets has been amended. A revised Statement of Work (SOW) is now attached to the solicitation. 2. BOTTOM LINE UP FRONT (BLUF) The amended SOW significantly expands the required scope of work to include on-site installation and demolition. Because of this expansion, all quotes received prior to this amendment no longer meet the scope of the solicitation and are considered invalid. Vendors wishing to compete for this contract must submit new quotes based on the updated requirements. 3. KEY SOW REVISIONS All offerors must review the amended SOW in its entirety. The most significant changes driving this expanded scope include: Expanded Scope (Installation & Demolition): The contractor must now handle the removal and disposal of the existing equipment and execute the full installation of the newly fabricated cabinets. Detailed Utility Access Points: Precise, documented dimensions are now provided for utility holes. The contractor must pre-drill these access points in the stainless steel top and backsplash for coffee machines, soda fountains, and water/ice machines. Internal Configurations: The internal housing specifications have been updated. This includes specific appliance placement and a new requirement for a pull-out bottom shelf to accommodate the bag-in-the-box (BIB) syrup system. Defined Responsibilities: The SOW establishes clear boundaries for demolition, installation, and utility connections between the Contractor, Government personnel (Civil Engineering *Note: The overall cabinet dimensions, material requirements, and mobility specifications (casters) remain unchanged.* 4. ACTION REQUIRED FOR ALL VENDORS Due to the substantial changes in on-site requirements, previously submitted pricing is no longer technically acceptable. If you previously submitted a quote: You must submit a brand new, revised quotation that accounts for the expanded scope if you still wish to be considered for award. For all submissions: Please acknowledge receipt of this amendment when submitting your new quotation.

Primary contact

Joseph Hupp · [email protected] · 2084225594

Related link ↗

Every notice on this board links its official SAM.gov listing — verify details there before responding.

Run federal grants too?

Contract notices are free to browse and are not part of member fit-scoring, alerts, or the Tuesday digest — those cover grants. Members get every federal grant that opens fit-scored to their organization — with an alert when a real match posts.

See grants pricing

Get the free Tuesday grants digest

One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Contract notices stay on this free board. Unsubscribe any time.

The free edition carries one clearly labeled sponsor slot. No spam, ever. Privacy

Want contract alerts?

Fit-scored alerts cover grants today; this contracts board is free to browse. If alerts for contract notices would help your team, say so below — enough interest is what gets them built.

Stored once, used only to tell you if contract alerts launch. No newsletter, no spam. Privacy