MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2_Amend 1
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA8903 772 ESS PK
Responses are due 2026-09-09, 10:00 (UTC−05:00).
View on SAM.gov →Official listing
- Posted
- 2026-08-25
- Response deadline
- 2026-09-09, 10:00 (UTC−05:00)
- Set-aside
- No Set aside used (NONE)
- Product/service code
- Y1JZ
- Place of performance
- Dover AFB, DE, USA
Description
Amendment 1 (25 Aug 26) Updates: "Presolicitation" This MACH1_AOI opportunity is updated with the following changes: 1. Previous Versions published as a "Special Notice" (Posting Type) were deleted & replaced with this "Presolicitation" posting 2. "Related Notice" block now reflects the associated MACH1_Parent Notice [FA8903-OT-MACH1] Original AOI Posting (21 Aug 2026) "Special Notice" This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a. The 772nd Enterprise Sourcing Squadron (772 ESS) is seeking innovative commercial design and engineering partners to develop a comprehensive, site-specific design package for rapidly deployable Earth-Covered Munitions (ECM) storage facilities at Dyess AFB, Texas. The Government requires rapidly deployable Class V munitions storage facilities to support evolving global threats and warfighter readiness. Traditional MILCON processes and standard ECM build face structural and procedural bottlenecksranging from slow curing times to complex bespoke formworkthat prevent rapid deployment. This AOI seeks architectural and engineering innovations that bypass these traditional bottlenecks. The Government is looking for design concepts incorporating advanced formwork, rapid-curing materials, modular structural arches, or other commercial methodologies that accelerate the timeline while fully maintaining all required blast resistance, structural integrity, and environmental controls. There are (2) two lines of effort (LOEs) for this requirement: LOE 1 - Design & Planning (Design) and LOE 2 - Physical Construction. See attachment PDF: MACH1_AOI_FA890326OT003_Muns_Igloos_Dyess_ 21 Aug 26.pdf
Primary contact
772 ESS/PKA · [email protected]
Every notice on this board links its official SAM.gov listing — verify details there before responding.
Run federal grants too?
Contract notices are free to browse and are not part of member fit-scoring, alerts, or the Tuesday digest — those cover grants. Members get every federal grant that opens fit-scored to their organization — with an alert when a real match posts.
See grants pricingGet the free Tuesday grants digest
One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Contract notices stay on this free board. Unsubscribe any time.
Want contract alerts?
Fit-scored alerts cover grants today; this contracts board is free to browse. If alerts for contract notices would help your team, say so below — enough interest is what gets them built.