PIGA Float Assembly Repair Program
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA8214 AFNWC PZBB
Responses are due 2026-10-05, 12:00 (UTC−06:00).
View on SAM.gov →Official listing
- Posted
- 2026-08-11
- Response deadline
- 2026-10-05, 12:00 (UTC−06:00)
- NAICS code
- 334511
- Product/service code
- J014
Description
Login at https://piee.eb.mil and search for 'FA821426RB002' to obtain more details.* Documents related to this procurment are only available through PIEE. 1. Executive Summary: Background & Objective The U.S. Air Force has a critical requirement to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) by maintaining the operational readiness of the Missile Guidance Set (MGS) to meet warfighter requirements. Specifically, this effort supports the repair line for the Pendulous Integrated Gyroscopic Accelerometer (PIGA) Float Assembly. The PIGA Float is a critical and precise sub-assembly that serves as the heart of the PIGA instrument, enabling it to measure missile acceleration. Each MGS contains three separate PIGA instruments (each housing a PIGA Float). Without this critical component, the ICBM would cease to function properly. The PIGA Float repair effort is a continuous operation necessary to avoid mission degradation. Quality control and precision engineering are paramount due to the strategic importance of the MMIII weapon system. The contractor must maintain stringent quality assurance protocols to guarantee that each repaired PIGA Float meets the rigorous military specifications. 2. Scope of Work The contractor shall provide the necessary personnel, facilities, and expertise to support the PIGA Float Assembly repair line. The primary scope includes: Repair Operations - The re-manufacture, rebuild, and repair of PIGA Float Assemblies. Volume / Throughput - The repair of 96 PIGA Floats per year. Government Furnished Equipment (GFE) - The repair and/or replacement of GFE as required to support continuous operation of the PIGA Float repair line 3. Contract Structure & Period of Performance The Government anticipates awarding an Indefinite Delivery/Indefinite Quantity (IDIQ) contract utilizing a mix of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP) pricing arrangements. Contract Duration - 5-Year IDIQ Anticipated Ordering Period - 1 November 2026 31 October 2031 Task Order Structure - Annual issuance of new, two-year non-severable Task Orders 4. Acquisition Authority & Strategy In accordance with Revolutionary FAR Overhaul (RFO) Subpart 5.1, this solicitation is an intended sole-source procurement. The Government will solicit and negotiate with only one source: Honeywell Aerospace (CAGE: 09128). This action is taken under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1. Market researchincluding Sources Sought Synopsis FA821425CBPIGA (posted 29 May 2025)concluded that Honeywell Aerospace is the only responsible source capable of fulfilling the Governments requirement without causing unacceptable delays to the MMIII weapon system mission. Note: While this is not a request for competitive proposals, information received from other responsible sources identifying their interest and capability will be considered solely to determine whether to conduct a competitive procurement in the future, at the Governments discretion. 5. Proposal Submission Instructions All proposals submitted in response to this solicitation must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No other methods of proposal submission (e.g., email, hard copy, DoD SAFE) will be accepted. Offerors must be registered in PIEE and have the appropriate roles activated to submit proposals via the Solicitation module prior to the proposal due date. Cost & Pricing Data: The Government requests that ProPricer models (version v9.5.105.2) be submitted in conjunction with all Certified Cost and Pricing Data. Mandatory Pricing Rubric: Submission of the attached Pricing Rubric is a mandatory requirement. Proposals submitted without a completed Pricing Rubric will be automatically rejected by the PIEE solicitation module and will not be considered for evaluation. Submission Cutoff: Proposals will not be accepted after the solicitation closes. Timely submission is the sole responsibility of the offeror, and late proposals will not be evaluated unless otherwise stated under RFO guidelines.
Primary contact
Jeremy Bruening · [email protected]
Every notice on this board links its official SAM.gov listing — verify details there before responding.
Run federal grants too?
Contract notices are free to browse and are not part of member fit-scoring, alerts, or the Tuesday digest — those cover grants. Members get every federal grant that opens fit-scored to their organization — with an alert when a real match posts.
See grants pricingGet the free Tuesday grants digest
One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Contract notices stay on this free board. Unsubscribe any time.
Want contract alerts?
Fit-scored alerts cover grants today; this contracts board is free to browse. If alerts for contract notices would help your team, say so below — enough interest is what gets them built.