HI FLAP CR562(1) Kilauea Point
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI
No stated response deadline. Posted 2026-10-15.
View on SAM.gov →Official listing
- Posted
- 2026-10-15
- Set-aside
- No Set aside used (NONE)
- NAICS code
- 237310
- Product/service code
- Y1LB
- Place of performance
- Kilauea, HI, USA
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles. PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.
Primary contact
Stephanie Navarro · [email protected]
Every notice on this board links its official SAM.gov listing — verify details there before responding.
Run federal grants too?
Contract notices are free to browse and are not part of member fit-scoring, alerts, or the Tuesday digest — those cover grants. Members get every federal grant that opens fit-scored to their organization (the home page defines exactly what the board covers) — with an alert when a real match posts.
See grants pricingGet the free Tuesday grants digest
One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Contract notices stay on this free board. Unsubscribe any time.