Laboratory Analysis - Phase II Environmental Site Assessment - Royal Electric Yard, Sykesville, MD
TRANSPORTATION, DEPARTMENT OF › OFFICE OF THE SECRETARY › 6913G6 VOLPE NATL. TRANS. SYS CNTR
Awarded to PACE ANALYTICAL SERVICES, LLC Saint Paul MN 55113 USA for $44,538 on 2026-08-26.
View on SAM.gov →Official listing
- Posted
- 2026-08-26
- NAICS code
- 541380
- Product/service code
- F999
- Place of performance
- Saint Paul, MN, 55113, USA
- Award number
- 6913G626P800048
- Award date
- 2026-08-26
- Awardee
- PACE ANALYTICAL SERVICES, LLC Saint Paul MN 55113 USA
- Award amount
- $44,538
Description
INTRODUCTION: Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the U.S. Environmental Protection Agency (EPA) Targeted Brownfields Assessments (TBA) Program. As part of this effort, a Phase II Environmental Site Assessment (ESA) that includes a requirement for laboratory analysis will be conducted at the Royal Electric Yard (the Site) located at 7512 Main St, Sykesville, Maryland 21784. BACKGROUND: The objective of this Phase II ESA is to determine if the historical activities have impacted soil at the Site. Laboratory analytical data from soil samples obtained through the advancement of test pits and soil borings will be compared to the Soil Residential Clean-up and Protection of Groundwater Standards established by Maryland Department of the Environments Cleanup Standards for Soil and Groundwater Table 1 (October 2018). TASKS TO BE PERFORMED: The Phase II ESA investigation includes the Contractor tasks listed below. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirements. 1) Sample Containers, Handling, and Delivery: The Contractor shall provide the appropriate sample containers, disposable volatiles samplers, preservatives, pre-printed labels, and analyte-free water required for the analyses listed below. These are to be delivered by the Contractor to the project site location. Sample collection and handling will be performed by Volpe personnel. The laboratory shall provide a daily local courier to transport the samples from the Site to the laboratory over an anticipated three days of sampling. Whenever possible, the Contractor shall minimize the number of sample containers by combining compatible analyses into a single container, as allowed by EPA methods and laboratory standard operating procedures. 2) Sample Analysis: The Contractor shall conduct analysis on samples for the parameters listed below in Table 1. The Contractor and any subcontracted laboratories must be certified by PADEP for each analytical method being performed.
Every notice on this board links its official SAM.gov listing — verify details there before responding.
Run federal grants too?
Contract notices are free to browse and are not part of member fit-scoring, alerts, or the Tuesday digest — those cover grants. Members get every federal grant that opens fit-scored to their organization — with an alert when a real match posts.
See grants pricingGet the free Tuesday grants digest
One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Contract notices stay on this free board. Unsubscribe any time.
Want contract alerts?
Fit-scored alerts cover grants today; this contracts board is free to browse. If alerts for contract notices would help your team, say so below — enough interest is what gets them built.