Combined Synopsis/Solicitation

H399--OKC Elevator Test and Inspection (Semi Annual and Annual Service)

VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › NETWORK CONTRACT OFFICE 19 (36C259)

Responses are due 2026-10-19, 10:00 (UTC−06:00).

View on SAM.gov →Official listing

Posted
2026-10-08
Response deadline
2026-10-19, 10:00 (UTC−06:00)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
NAICS code
541350
Product/service code
H399
Place of performance
Department of Veteran Affairs Oklahoma City VA Medical Center 921 N. E. 13th Street, Oklahoma City, OK, 73104, USA

Description

This amendment is to provide clarifications and corrections to previously combined synopsis amendment for RFQ 36C25926Q0882 0001 OKC Elevator Test and Inspection (Semi Annual and Annual Service) Amendment 0002 provides further clarification and corrections via the following changes: - Due to some requirement confusion all previously redlined (example) language has been fully removed. - All final language changes have been identified by Dark Red, bolded, and italicized lettering, to include previously blue lettering. - It was brought to our attention that ASME 17.1 was used for new construction. This requirement is for the test and inspection of existing elevator equipment and therefore is governed by ASME 17.2 (Guide for Inspection of Elevators, Escalators, and Moving Walks: Provides inspection procedures and guidance for inspectors) and ASME 17.3 (Safety Code for Existing Elevators and Escalators: Covers safety requirements for elevators and escalators already in service, including modernization and existing-equipment conditions.) - Answer to question 5 and 14 was missing specific ASME QEI-1 certification guidance. Both were amended to include the following clarification language: To be eligible for award, the Contractor shall provide evidence of the following in their Factor I. (Technical capability or quality offered to meet the Government requirement) documents: A. The inspector must meet the qualification requirements of the ANSI/ASME QEI-1 certification. Inspectors must be certified by an organization accredited by ANSI/ASME in accordance with the requirements of ANSI/ASME QEI-1 and the contractor must provide proof of QEI-1 certification for their inspectors. A copy of the certificates must be provided with the proposals. All work performed under this contract must be accomplished by QEI-1 Certified Inspectors with the COR and a Certified Elevator Technician. - Answers to questions 6 and 13 were a bit contradictory. Answers amended to read as follows: The VA specifically requires documentation associated with ASME QEI-1 inspector qualifications only and no Oklahoma specific licensing is required for this action. - Answers to questions 4 and 18 were incorrect. Upon further review it has been determined that the VA will require the contractor to hold applicable Liability insurance for this requirement. Answers to questions 4 and 18 have been amended to read as follows: The insurance requirement will remain. The Government has determined that insurance coverage is appropriate for services performed on the Government installation. The solicitation will be amended to identify the specific types and minimum amounts of insurance required. See the amended PWS and FAR 52.228-5, Insurance Work on a Government Installation. The minimum general liability coverage limits are outlined in Clause CL-120 (Supplemental Insurance Requirements) in this amended solicitation, To be eligible for award, the Contractor shall provide evidence of the following in their Factor I. (Technical capability or quality offered to meet the Government requirement) documents: Written evidence to the Contracting Officer that the required insurance is held. The Contractor shall, at its own expense, provide and maintain during performance of the contract the insurance coverage specified in the solicitation. The Contractor shall maintain the required coverage throughout the period of performance, including any exercised option periods. - due to the inclusion of liability coverage FAR clauseCL-120 (Supplemental Insurance Requirements) was added to this solicitation in full text and FAR clause 52.228-5 (Insurance Work on a Government Installation) was added to the solicitation by reference. Proposal expectations: Factor I submittals: 1) Inspector qualifications/certifications 2) Proof of insurance coverage 3) Description of the offeror's technical approach. Factor II submittal: 1) Completion of Attachment - VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services (DEVIATION) Factor III submittal: 1) Price/Cost Schedule. All other terms and conditions remain the same.

Primary contact

Contracting Officer · Mark Holland · [email protected] · 303-712-5828

Related link ↗

Every notice on this board links its official SAM.gov listing — verify details there before responding.

Run federal grants too?

Contract notices are free to browse and are not part of member fit-scoring, alerts, or the Tuesday digest — those cover grants. Members get every federal grant that opens fit-scored to their organization (the home page defines exactly what the board covers) — with an alert when a real match posts.

See grants pricing

Get the free Tuesday grants digest

One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Contract notices stay on this free board. Unsubscribe any time.

No spam, ever. Privacy