Get alerts
Archived

Connected Communities 2.0: Innovations to Manage Growing Transportation, Building, and Industrial Loads to the Grid

Posted
July 22, 2024
Closed
October 16, 2024
Award ceiling
$6,000,000
Award floor
$3,000,000
Program funding
$65,000,000
Expected awards
0
Cost sharing
Yes
Instrument
Cooperative Agreement
Assistance listing
81.086
Category
Energy
Archives
November 15, 2024

Program funding history

Awards made under Assistance Listing 81.086 across FY2024–FY2026, from public federal spending records.

FY2024 obligated
$603M
FY2025 obligated
$127.2M
FY2026 (to date) obligated
$22M
Awards in window
1,115

Top recipients: North Carolina State University, 22 Beacon, Inc., The School Board of the City of Richmond, Lowell Public Schools, Unified School District 259

Source: USAspending.gov · refreshed September 2026 · Program page: awards, recipients and the opportunities under this listing →

This opportunity is archived. Applications are no longer accepted. Similar grants are listed below, and the free Tuesday digest carries the next ones like it.

Synopsis

This modification extends the Full Application deadline from October 10, 2024 to October 16, 2024 due to natural disaster, Hurricane Milton, impacting the ability of applicants to complete and submit an application by the deadline. The “Connected Communities 2.0: Innovations to Manage Growing Transportation, Building, and Industrial Loads to the Grid” Funding Opportunity (FOA) issued by the Office of Energy Efficiency and Renewable Energy is designed to address major new loads from transportation, industry, and buildings on the electric grid by providing new tools for users, planners, and operators of the electric grid. This FOA has two major topical areas: Connected Communities 2.0, focused on grid edge technical measures in buildings, industry, and transportation to prepare the electric grid for these new loads, and improve the resilience of customers and the grid; and Smart Charge Management (SCM), focused on various unique urban, suburban, and rural use cases to build confidence in SCM as an effective approach for electric vehicles (EVs) to provide flexibility and value to the electric grid. The learnings from these projects should enable electric system planners and operators, strategic planners, regulators such as Public Utility Commissions (PUCs), and other stakeholders to understand and plan for new load growth and peak loads driven by electrification, growth in manufacturing, and new computing developments; and to plan for physical and cyber threats to reliability and resilience, while keeping costs affordable for customers and ratepayers. To achieve this end, the cohort of awarded projects will pursue three primary goals. First, the cohort will demonstrate how smart and coordinated management of EVs and other distributed energy resources (DERs), including the integration of efficiency, smart electrical panels, solar, heat pumps, controls, EV charging, and storage can together provide grid support, reduce system costs, and improve the economics of customer technology adoption, at a scale sufficient to enable confidence in wide-scale adoption. The second goal is to demonstrate approaches that enable acceptance by utilities, PUCs, and communities of smart charge management, grid-edge technical measures and innovative planning strategies as valid methods towards right sizing investments in the distribution system. The third and final major goal for the cohort is to demonstrate approaches towards improved resilience for communities, end-use customers, and the overall grid in the face of growing loads, extreme weather events, cyber threats, and increasing reliance on the electric grid through the use of grid edge technical measures. This FOA will award an estimated $65M, and is a cross office FOA co-funded by BTO, VTO, SETO, IEDO, GTO, and OE. Modification 0001: The purpose of this modification is to extend the Full Application deadline from October 10, 2024 to October 16, 2024 due to natural disaster, Hurricane Milton, impacting applicant’s ability to complete and submit an application by the deadline. The full Funding Opportunity Announcement (FOA) is posted on the EERE eXCHANGE website at https://eere-exchange.energy.gov. Applications must be submitted through the EERE eXCHANGE website to be considered for award. The applicant must first register and create an account on the EERE eXCHANGE website. A User Guide for the EERE eXCHANGE can be found on the EERE website https://eere-exchange.energy.gov/Manuals.aspx after logging in to the system. Information on where to submit questions regarding the content of the announcement and where to submit questions regarding submission of applications is found in the full FOA posted on the EERE Exchange website, https://eere-exchange.energy.gov. Please see full announcement at: https://ie-exchange.energy.gov/

Who can apply

Please see full eligibility requirements under the FOA posting at https://eere:exchange.energy.gov/. The Eligibility requirement are in Section III.A of a FOA document.

The official record

Grants.gov published the official terms and dates of this opportunity; this page keeps them as they were listed.

View on Grants.gov

Agency contact: Golden Field Office · [email protected] · 202 287-1878

Tell me when this program posts again

This round has closed. One email the morning after this program is posted again under a new number (we watch for about two years), and one more about a week before that round closes (the next morning, if it is already closer than that). That is all this sends — it is not a newsletter signup.

Stored once per grant, used only for this watch’s emails; every one carries a one-click unsubscribe. Privacy

Get grants like this every Tuesday — free

One email a week: the biggest new federal grants and what’s closing soon — the same list for everyone. Unsubscribe any time.

No spam, ever. Privacy

Similar grants

Same-day alerts, matched to you

The free digest is weekly — the same list for everyone. Members get every open federal grant scored to their organization — and an alert the day a real match posts: we read every new posting the day it opens. Free for 30 days, then $29/mo. Card required, cancel any time before day 31.

Not ready for a subscription? A one-time Fit Report — $29 — scores every open federal grant to your organization once, by email within one business day.

See pricing